SUSTAINABLE HEAVY-DUTY INITIATIVES FOR FUTURE TECHNOLOGY

Project

The Green On-Road Linen Delivery Project

The San Joaquin Valley Air Pollution Control District (SJVAPCD) led a project to deploy 21 zero-emission, all-electric walk-in vans for linen delivery—a delivery segment well-suited for electrification. Industry partners included Motiv Power Systems, AmeriPride Services, and CALSTART. AmeriPride, a uniform and linen service provider since 1889, selected its Stockton, Merced, Fresno, and Bakersfield locations—primarily in disadvantaged communities—for demonstration. The vans used Motiv’s EPIC F-59 chassis, an all-electric, body-ready alternative to traditional internal combustion vehicles. SJVAPCD, a public health agency committed to improving air quality and community health, drew on its deep experience with clean air incentive programs to administer the project under the Zero-Emission Truck and Bus Pilot Commercial Deployment solicitation, serving as a model for statewide grant implementation.

Vehicles/Equipment Funded:

This project focused on taking an electrified commercial walk-in van application, previously only deployed in small commercial projects, and scaled it to AmeriPride’s local fleet operations. This provided an opportunity to validate the core technology at a fleet and operational portfolio level, generating the data required to support future full all-electric fleet deployments. All project trucks were built on a Motiv-powered, all-electric Ford F-59 chassis. Project vehicles are distributed as follows:
  • 4 Motiv zero-emission walk-in-vans deployed at AmeriPride Stockton, CA
  • 5 Motiv zero-emission walk-in-vans deployed at AmeriPride Merced, CA
  • 10 Motiv zero-emission walk-in-vans deployed at AmeriPride Fresno, CA
  • 2 Motiv zero-emission walk-in-vans deployed at AmeriPride Bakersfield, CA

Lessons Learned:

  • Maximum fleet performance is achieved through successful driver training.
  • Successful EVSE infrastructure implementation is a fully collaborative activity between site managers, utilities, and technology providers.

Status Updates:

  • Stockton fleet in service Q2 2018; CARB accepted Beta Test Report August 2018.
  • Merced fleet in service Q3 2018.
  • Fresno fleet in service Q2 2019.
  • Bakersfield fleet in service Q2 2019.
  • All vehicles in service as of Q2 2019.
  • Average fleet up time is 98% with cumulative fleet mileage of 231,400 as of Q1 2020.

Technology:

Tags:

Vehicles / Equipment Status:​

Infrastructure Status:

Project Facts​

  • DATES: Spring 2017 – Spring 2020
  • GRANTEE: San Joaquin Valley Air Pollution Control District
  • PARTNERS: Motiv Power Systems, AmeriPride Services, CALSTART
  • GRANT NO.: G16-ZTRK-03

Grant Amount​

  • CARB Contribution: $7,125,515
  • Matching Funds: $5,818,168
  • PROJECT TOTAL: $12,943,683

Partners